Projects

Client

Aritzia

Location

Costa Mesa, California

Architect

CC Architect

Description

The construction of Aritzia South Coast Plaza involved the installation of dust proof flooring, millwork ceilings, and millwork wall panels. Structural steel work included the installation of an L-profile longitudinal brace at the storefront, which was also outfitted with vinyl signage and clear glass windows. Fluted glass panels are used inside the store as a divider between different areas. Electrical, plumbing, and HVAC systems were upgraded, with some coring conducted after the demolition phase for electrical and plumbing. Additional millwork installations include a work station, bookcase, and cash closet. The space also makes use of Domus Terrazzo marble and stucco tiles. Overall, this 6,579 square foot boutique was built within a 16 week construction schedule.

HIDE
Clients
  • User Project Images Image 1516
  • User Project Images Image 1517
  • User Project Images Image 1518
  • User Project Images Image 1519
  • User Project Images Image 1520